The West Coast New Area will add things to a fast channel!Jialingjiang Road Fast Transformation Project is about to start

Author:Qingdao Daily Time:2022.09.21

Qingdao Daily/Guanhai News, September 21st. With the end of the Binhai Avenue broadening project and the reconstruction of the Yangtze River Middle Road, the stress of east -west traffic in the west coast New Area has become smoother, but traffic pressure is still not small. Guanhai News reporter was informed that the G228 Dandong Line (Jialingjiang Road West Yan section) was changed into countdown, and the new district is about to start the rapid transformation project of Jialingjiang Road (Kunlun Mountain Road-Entrusted Road). With the opening of this section, Jialingjiang Road will truly become the first east -west expressway on the West Coast New Area.

It is reported that Jialingjiang Road is an important "one horizontal" in Qingdao's "six horizontal nine vertical" high -speed road system. The important control nodes of the fast channel of Qingdao West Station. At present, Jialingjiang Road (east of Fenjin Road) is connected through Binhai Avenue and Jiaozhou Bay Tunnel. The west extension section of the Jialingjiang Road is planned to start this year. Only Kunlun Mountain Road to Fenfen Road is not connected. The implementation of the rapid reconstruction project of Jialingjiang Road (Kunlun Mountain Road-Endurance Road) will realize express roads to add fast channels to the new district.

The G228 Dandong Line (the west extension section of Jialingjiang Road) was renamed. From the intersection of Kunlun Mountain Road and Jialingjiang Road in the east, it adopted a separate special tunnel to the west and passed through the small Zhushan. Finally, it was connected to Jiaozhou Bay West Road, with a total length of about 12.13 kilometers. The main line of this line is first -class highway and urban expressway, two -way six -lane, with a design speed of 80 km/h. The main line of the rapid transformation of Jialingjiang Road (Kunlun Mountain Road to Fine Endeter Road) is the same as its standard. The project is about 1.6 kilometers. The project combines the development of surrounding land, road function and traffic organizations. The final research determines the use of elevated forms.

After the project is completed, it will form a one from the West Extension of Jialingjiang Road (under construction) -gelia Expressway (Planning Express Road)-Jiangshan Road (Planning Expressway) -Haihe Road Elevated Construction) -Caponic Channel composed of Hangzhou Sadfords-Chongqing Road Expressway (under construction), with a total length of about 60 kilometers (about 50 kilometers of construction), further drawing closer to the distance between the west bank and the east bank urban area and the north coast urban area to improve Urban and rural transportation level. (Qingdao Daily/Guanhai Journalist Wang Kai Correspondent Li Guohua)

- END -

Feng Henian was checked

According to the Central Commission for Discipline Inspection, the Discipline ...

Martyr Li Linyu "go home" | New Thai citizen: Pride for our new Thailand!

Although he had never met, although he had never known each other, at the scene of...