Kunming released the "Fourteenth Five -Year Plan" fire rescue business development plan will build 15 new fire stations

Author:Kunming released Time:2022.09.22

On September 19, the "Fourteenth Five -Year Fire Fire Rescue Development Plan" (hereinafter referred to as the "Plan") released by the Kunming City Government proposed that by the end of 2025 The average annual GDP fire loss rate is less than 0.06 %. The incidence of average people in the annual is less than 0.55.

"Full time, visualization"

Monitoring fire safety status

In terms of comprehensive purification of fire safety environment, improve the law of fire law, comprehensively implement fire safety responsibilities, strengthen comprehensive supervision of fire safety, and strengthen the construction of smart fire protection. Among them, in the comprehensive supervision of fire safety, the special actions of key fire safety governance during the "14th Five -Year Plan" period of Kunming City, that is, carrying out the special governance of fire safety in the famous villages, cultural relics protection units and traditional villages of historical and cultural cities; Special governance of life channel projects, carry out illegal acts such as the supervision and inspection of fire truck channels in violation of regulations, and strictly investigate and deal with illegal acts such as old communities occupation, blocking, and closed fire truck channels; towns, streets, and communities must be carried out in the roadside parking lots around the old residential communities under the jurisdiction. The setting situation is conducted to investigate and promote the establishment of policies and mechanisms such as elastic parking, opening, tidal parking, and sharing parking.

Carry out special treatment of fire safety in pension institutions to ensure that the pension institutions do not have fire safety accidents; carry out special management of electric bicycle fire safety, and investigate and deal with counterfeit and inferior products from electric bicycles. The unit, community, and residential communities standardize electric bicycle parking points, charging grid (shed) settings, and launch the residential committee, residential residential construction units, and property service management units to carry out grid investigation and rectification of illegal storage of electric bicycles in the residential corridor, Practical issues such as charging wires and other issues, resolutely prevent electric bicycles from causing fire to cause mass death.

Comprehensively build smart fire protection projects, complete key projects such as fire protection big data application platforms, and realize the summary, analysis, research and judgment, resource sharing of various data of various government departments, and effectively improve the effectiveness of fire prevention and control, fire extinguishing and comprehensive emergency rescue interest rates. "Full of time, visualization" monitoring fire safety status, "real -time, intelligent" monitoring and evaluation of fire safety risks, realizing differentiated and precise supervision, realizing dynamic monitoring, risk assessment, intelligent analysis, and grading scores of high -risk places and regions of fires in fires, and realized high -risk places and regions. Color warning.

Build 3 full -time fire brigade

And 12 ordinary fire stations

Incorporate fire knowledge into the teaching content of primary and secondary schools, kindergarten, and colleges and universities, and high school freshmen for military training courses to ensure that the number of fire -knowledge education courses sets in each semester of elementary and middle schools is not less than 4 lessons. The city's recruitment and development of fire -fighting volunteers is not less than 20,000, and the counties (cities) are recruiting and developing fire -fighting volunteers less than 3%of the number of resident population (over 14 years old, under 70 years old).

Optimize the comprehensive fire rescue command system, build a professional duty training system, strengthen the professional forces of fire rescue, and strengthen the construction of emergency communication capabilities. Among them, actively explore the in -depth applications of advanced communication equipment such as 5G, AI/AR technology, wide -narrow belt integration communication, the Internet of Things, Beidou, and drone in fire emergency communication; in -depth transformation of large mobile squares command vehicles to explore aviation intelligent perception In -depth use of drones, build a spring city fire "blue swallow" drone commando; build a water rescue emergency communication system, and build a "one platform and three systems".

Further strengthen the construction of the government's full -time fire brigade, and build three city government fire brigade in high -risk risks such as Ala Street, Azong District, Panlong District, and Shuangxian Township in the Economic Development Zone, and supplements the full -time government fire brigade in high -risk risks.

In terms of comprehensive strengthening of the construction of fire public infrastructure, implement the construction of fire public infrastructure construction projects, and build 12 ordinary fire stations, namely Yangzonghai Scenic Area whistle, Yunnan Road Fire Rescue Station, Guandu District Huizhan Fire Rescue Station, Xishan Founder Sunac Cultural Tourism City Fire Station, Anning Fire Rescue Brigade and Kunyu Road Fire Rescue Station, Jinning District Fire Safety Emergency Rescue Training Base, Songming Yanglin Economic and Technological Development Zone Fire Rescue Station, Guandu District Yunfu Road Fire Rescue Station, The full -time team of Luoyu Bay Government, the Shilin County Fire Rescue Brigade Two Station, Wuhua District Tuanshan Fire Rescue Station, Kunming Rail Transit Fire Special Service Station, and the Airport Economic Zone Li Qi Fire Rescue Station. Create three new fire stations, namely Guandu District closed the streets of small fire stations, the World Expo Fire Rescue Brigade Aziying Fire Station, and the Banqiao Community of the Airport Economic Zone. Continue to carry out the construction of a fire training base.

By 2025, all fire rescue stations in the city will maintain a 100%equipment and 100%intact rate. Promoting 100%standards for special disaster rescue equipment to improve the actual combat ability to respond to various complex disasters.

Overall objective

1. The average annual fire mortality rate of 100,000 people is within 0.18

2. The average annual GDP fire loss rate is less than 0.06 %

3. Annual average human factors that the fire incidence of fire is lower than 0.55

Sub -item indicator

The digital fire work pattern is basically formed:

Industry information data synchronization sharing rate reaches 100%. Emergency communication guarantees under the conditions of power -off, circuit breaking, and network breaks of 100%.

The precision fire protection comprehensive management system is basically formed:

The industry department's fire safety standardization management compliance rate is 100%; the standardization rate of fire safety standardization management of key social units is 100%; the rectification rate of fire hazards of "high, low, large, and chemical" places is 100%; the completion rate of the listing of major fire risks is 100%; 100%;Fire -fighting grid management up to 100%.Reasonable fire resources layout basically forms:

The construction synchronization rate of new road municipal pipeline networks and fire hydrants has reached 100%, and the construction rate of municipal fire hydrants has reached 100%. The construction rate of fire water sources such as water supply platforms and water storage facilities in more than 100 households has reached 100%.

Professional comprehensive rescue capabilities basically formed:

Realize the level of full -time fire brigade of various types of townships and villages reached 100%.

Socialized fire safety atmosphere basically formed:

Urban residents 'fire safety awareness rate reaches 80%, rural residents' fire safety awareness rate reaches 70%, and the satisfaction rate of fire safety people has reached 90%.

Source: Urban Times

- END -