Snowy Plateau "zero carbon" optical storage thermal power demonstration project resume work

Author:Tibetan Daily Time:2022.09.23

Recently, the "zero carbon" optical storage thermal power demonstration project in the Alibaba Snow Plateau in Lishiquan River Town, Shiquanhe Town, Ali area was resumed. At the construction site, the workers wore a mask and carried out the work in an orderly manner to measure the stakes such as measuring lines, flat venues, and pile piles.

It is understood that since the re -production of the "zero carbon" optical storage thermal electricity demonstration project of the China -Canton Nuclear Alibaba Snow Plateau, the construction party has actively implemented the responsibility of the main body of the normalized epidemic prevention and control, and establishes a sound epidemic prevention and control mechanism in accordance with the established epidemic prevention and control work plan. In the aspects of the construction of the construction, personnel entry, raw material supply, supply of raw materials, supply of raw materials, supply of living materials, supplies of epidemic prevention, and on -site concentrated epidemic prevention, etc.

The reporter learned that in order to ensure the smooth progress of the project, the construction party also actively absorbed the local masses and label workers to employment in the nearest employment, participated in the project construction, on the one hand, to help the local people increase income, and on the other hand, the problem of the current shortage of employees. "Recently, I have been unable to go out at home during this day. Now I can run a car on the project site to make money." Said Gama Jiangcuo, a villager in Jiamu Village, Gal County.

In addition, in the implementation of the project, in order to ensure the safety and physical health of workers, the construction party set up a resettlement point such as cafeteria, dormitories, etc., and implemented closed -loop management of workers to ensure that workers' needs for eating and accommodation in the project construction. At the same time, the construction party strictly implements various epidemic prevention and control measures, implemented various systems such as nucleic acid (antigen) testing, real -name registered body temperature, green codes, and disinfection, and only in the closed -loop management. Order.

"After resumption of work and re -production, we have absorbed some local construction personnel and part of the remaining migrant workers, as well as a large number of construction equipment in Jiamu Village. In the future, we will continue to invest in personnel and equipment, grasp the production in one hand, grasp the epidemic prevention, and strive to achieve the expectations of the project's expectations of the project. Target. "Ding Hongliang, the" zero -carbon "optical storage thermal power demonstration project of China -Guangzhou Nuclear Ali Snow Plateau, said.

- END -

Ningling County Meteorological Bureau issued a thunderstorm and yellow warning [III class/heavier]

Ningling County Meteorological Observatory issued a thunderstorm and yellow warning signal at 00:40 on June 9, 2022: It is expected to be affected by thunderstorms in Liuhe Town, Chengguan Town, and Z

Qingdao Chengyang District prefabricated vegetable industry appeared in RCEP Economic and Trade Cooperation High -level Forum

Popular Network · Poster Journalist Zhang Qian Correspondent Ji Lili Qingdao Repo...