focus on!It's about G205 Boxing section to change the line!

Author:Master Binzhou Time:2022.09.23

G205 Shan Shen Line Bo Xing Pang Family to Lake Bin Section Reconstruction Project

The first publicity of environmental impact evaluation

1. The name and overview of the construction project

Project Name: G205 Shan Shen Line Boxing Pang Family to Lake Bin Section Reconstruction Project

Project location: Boxing County, Binzhou City, Shandong Province

Project Overview: The G205 reconstruction project starts from the G205 in the south of Anjia Village, Pangjia Town, Boxing County. The south along S228 was converted to the intersection of S316 and the S228, and it continued to build it to the south to the west to the west, and reached the end point to the intersection of the G205 mountain depth line and X028 of Hubin Town, Boxing County. The total length of the route is about 27 kilometers, of which about 13 kilometers of the new route, the renovation route is about 14 kilometers. The reconstruction adopts a bilateral width method. The project uses a two -way six -lane -level first -level highway standard construction, with a design speed of 80 km/h. The total investment of the project is about 2.16 billion yuan, and the construction period is 24 months.

Second, construction unit

Unit name: Boxing County Highway Business Development Center

Contact: Mr. Chu

Contact number: 15376293156

Email: [email protected]

3. EIA Preparation Unit

Unit name: Shandong Xinda Environmental Protection Technology Consulting Co., Ltd.

Fourth, consultation matters

Main matters for the public opinion:

(1) The current main environment of the local area;

(2) The feasibility of environmental protection measures taken by this project;

(3) What attitude to the construction of this project;

(4) Opinions and suggestions on the construction of this project.

Fifth, the network link of the public opinion form

According to the provisions of the "Environmental Impact Evaluation Public Participation Measures", in the process of the preparation of the comments draft of the environmental impact report, the public can put forward opinions related to the environmental impact assessment to the construction unit.

If the public has environmental protection opinions on construction projects, you can download the "Public Opinions Form for the Environmental Impact Evaluation of the Construction Project" for filling in and submitting.

The network link of the public opinion form: http://www.mee.gov.cn/xxgk2018/xxgk/xxgk01/201810/t20181024_665329.html

6. The way to submit public opinion forms and ways

You can send emails or calls to make suggestions from individuals, departments, and units. If you need to learn more about the project, please contact the construction unit.

Boxing County Highway Business Development Center

September 20, 2022

- END -

On August 29, 2 cases of non -symptoms were added in Chengguan District, Lanzhou City, details →

00:00 on August 29th to 24:00The epidemic situation of Xin Guan Pneumonia in Cheng...

Jiangbei District, Chongqing City held a national food safety demonstration city at a time

meeting venueOn September 13, Jiangbei District, Chongqing City held a meeting of ...