Nangang's latest batch of slow -moving green road construction involves these areas →

Author:Harbin Daily Time:2022.06.25

In 2021, the construction of the "Sangou" of Nansang District (the second batch) project (the second batch) project (the second batch) project (the second batch) has been approved by the relevant departments. It is planned to work on July 30 to September 15. The construction of the project is now public bidding.

Among them, the area of ​​the Hejiagou Basin Railway Street area is about 1.8 hectares, the Binsui offline cross -river bridge is connected with the existing road pavement and the drainage of Hejiagou's drainage port, as well as services such as trash cans, seats and other services such as slow lanes. Facilities; the right bank of Hejiagou on the west side of the mountain village, the first cross -river bridge on the south side of Hejiagou and Third Ring Road in the north, and the second cross -river bridge section in the south to the south. A square meter (including 50 square meters), the project is newly built a D800 culvert.

Majiagou Guo Guli Street to Dacheng Street and the breakpoint section under Kuancheng Bridge, the road transformation of the break point under the Kuancheng Bridge is 168 square meters, the slow road reconstruction area from the Gogol Avenue to Dacheng Street is about 2,000 square meters, and The quartz brick pavement is about 470 square meters, as well as service facilities such as trash cans, seats such as slow lanes.

It has nothing to do with pictures and text: Photo.com

Majiagou Dacheng Street to Kuancheng Street and Civilized Street to Red Army Street section. The road from Dacheng Street to Kuancheng Street is transformed into a red asphalt pavement about 1,200 square meters, and the slow track of Civilization Street to Red Army Street is transformed into a cement concrete pavement about 980 square meters. The plastic floor near the Red Army Street is updated for about 900 square meters.

The south of Majiagou is from Yikang Street and north to the air power bridge section. The design content is maintained by the Mazao trail board on both sides of the river, with a length of about 1350 meters. The drainage outlets on both sides of the river are decorated with plastic stone decoration, with a total of 5.

The upper reaches of the Haicheng Bridge on the right bank of Majiagou, the current road is transformed into a barrier -free ramp, with an area of ​​about 10.8 square meters; the downstream left bank of Mujie Street is transformed into a barrier -free ramp, with a design area of ​​about 490 square meters. A barrier -free ramp is added to the current green space; the south side of the right bank of Dacheng Street, the current road is transformed into a barrier -free ramp. The road renovation project of the Children's Park will build a flood wall on the sidewalk concrete plate, and the prefabricated row railings are installed on the water stripboard.

The broken point of the Wendao Bridge on the right bank of Majiagou opened the project, and opened the board road breakpoint of the river bank under the bridge. Under the Haicheng Bridge on the right bank of Majiagou, there is a closed space under the current bridge. It opens the space under the bridge and builds a slow road. The length of the road is about 274 meters.

Below the Hejiagou Binsui Line Bridge is built with a new 2#cross -river bridge. The main bridge is 20.7 meters long. The lane road is 9.88 meters long, the right ramp is 3.6 meters long, and the width is 4 meters. The new cross -river bridge is built. The structure of the steel box beam is used, and the railing armrest is set on both sides.

Source: Bingcheng+Client

Reporter Wang Dan

PSAs

- END -

State Grid Nanjing Jiangbei New District Power Supply Company: "The first lesson" of the former integrity government helped the new appointment to start and take a good step

I promise: I will consciously keep the people's public servants in politics; I will use the right to use integrity and consciously safeguard the fundamental interests of the people ... On June 24, t...

The latest voice of Zelei

/According to CCTV News, on the 27th local time, the Seventh -way Group Summit in Germany entered the meeting schedule of the second day. Ukrainian President Zelei attended the meeting through a vid