The Ministry of Water Resources in Sichuan Province launched a water -drought disaster defense level IV emergency response to further arrange the deployment of water conservancy earthquake resistance and disaster relief work

Author:Chinese water conservancy Time:2022.09.06

At 12:52 on September 5, a magnitude 6.8 earthquake occurred in Luding County, Ganzi Prefecture, Sichuan Province. After the earthquake, Li Guoying, deputy commander of the National Defense General Defense and Minister of Water Resources, immediately deployed the water conservancy earthquake relief work, requiring to organize the investigation of various types of water conservancy projects and the formation of dammed lakes. Secondary disaster to ensure the safety of the people's lives, ensure the safety of engineering and water supply safety.

The Ministry of Water Resources Rolling the Council to study and judged that in accordance with the "Regulations on the Response Response of the Ministry of Water Resources and Drought Disaster Defense", at 9 o'clock on the 6th, the Sichuan Province launched the emergency response of the water -drought disaster defense defense defense, and guided the promotion of Sichuan Province to carry out related work. The first is to further investigate the water conservancy project in the earthquake area, establish a list of earthquake damage water conservancy projects, and implement emergency response measures one by one. The second is to closely follow the dangerous situation of the Donghe damage of the Dadu River tributary Bay, strengthen emergency monitoring, timely transfer to the people of the threatening region in a timely manner, and effectively deal with the dangerous situation scientifically. The third is to closely monitor the development of the rain and water conditions, roll the conferences to study and judge, and do a good job of scheduling and flood prevention of water conservancy projects. The fourth is to report information such as the investigation and emergency response of the water conservancy project.

According to preliminary statistics, as of the 00:00 on September 6, the Sichuan Provincial Water Resources Department sent a total of 1,327 teams of 283 teams, investigating 163 reservoirs, 1104 hydropower stations, 142 embankments, 32 culverts, 28 irrigation projects, 1457 key water supply projects 1457 There are 656 in the dangerous area of ​​the flood disaster. A total of 1 shock damage medium -sized hydropower station, 6 small hydropower stations, 7 water supply projects, 5 channels, and 2 embankments.

Source | Department of Water Resources Disaster Disaster Defense Department

- END -

Liaoyuan Road Street, Shibei District, carried out garbage classification into campus public welfare activities

Recently, Nanjing Road community on Liaoyuan Road, Shibei District launched a garb...

Jining City September 11, 2022 to 24:00 New Crown Pneumonia's epidemic situation

From 00:00 on September 11, 2022, 1 new local diagnosis cases were added in the ci...