Five new urban branches are built in the urban area, and the location is →

Author:Weifang Mercy Time:2022.09.20

Weifang Daily Weifang Rong Media News On September 19, the reporter interviewed and learned that recently there were five new road construction construction in Kuiwen District, of which three have been opened to traffic. The completion of these five roads has further revitalized the regional road network and provided convenience for residents to travel.

The section of Weizhou Road to Siping Road, Jinding Street, Kuiwen District has been opened to traffic.

Jinding Street is a urban branch between Yuqing East Street and Wolong East Street, Kuowen District. It was the Yuhe River in the east and Weizhou Road in the west. Last year, Kuiwen District launched the smooth and reconstruction construction of this road, extending to Siping Road west. On the morning of the same day, the reporter came to the section of Weizhou Road, Jinding Street to Siping Road. This road has been built and opened to traffic. There are two non -motorized lanes and two motor lanes. The street lights are equipped on both sides of the road, and the passing vehicles are smooth.

After the opening of this section, it greatly facilitated the travel of the surrounding residents. Ms. Liu, a resident of Jinding Shijia Community, said that one of the gates in the community is located on Jinding Street. It is more convenient to travel after this road is opened to traffic.

Ziwei Street, which has just been opened to traffic.

On the same day, the reporter also came to Ziwei Street on the south side of the Beiyuan Experimental School in Kuiwen District. This road has also been opened to traffic, and the road logos and marking lines have been completed. From the west of the road, Weizhou Road and Kufei Road in the east. As the school is close to the school, the traffic congestion of the surrounding roads has been greatly eased after opening the traffic.

The reporter learned from the Kuiwen District Housing and Construction Bureau that since September, five roads have completed construction in Kuiwen District. Among them, the west of Jinding Street has Siping Road in the west and Weizhou Road in the east, with a total length of 502.686 meters; the planning road west of Lanwan Street, the east to the airport road, 342.444 meters in length; Yuxing Street is a north -south city branch, south From Tongting Street, to Yuqing East Street in the north, the total length is 1165.985 meters. From the urban branch road, from Weizhou Road in the west, to Kufei Road in the east, 495.056 meters in length.

At present, all the five new roads have been completed and constructed, and Jinding Street, Ziwei Street, and Yuxing Street have officially opened to traffic and have begun to play a role. The residential communities on both sides of Lanwan Street and the road roads on the road are still under construction. In order to ensure safety, there is no opening to traffic for the time being.

Weifang Daily All -Media Reporter: Zhao Chunhui/Wen Tu

Editor in charge: Yuzi

- END -

It is not planned in the summer vacation, and the gap between school opening is large. This "357 Gold Plan Form" is too useful.

Author | SummerSource | Boys' originalIt's about to pass the summer vacation soon,...

Do you want to be ozone bacteria in summer high temperature?There is no such bacteria at all

Recently, the Shanghai rumor platform received a lot of messages in the background...